The working principle of the ash container is to collect the ash that reaches the boiler house through the ash removal system. The operation of the ash separation is determined by the controller controlling the operation of the boiler house, which starts the ash works according to the given times. First the leveling auger is started in the ash container, then the ash auger and finally the hearth ash auger.
A leveling auger is installed in the upper part of the ash box for a more even filling of the ash container. The ash container is built in such a way that it can be transported in a Multilift car. The ash container is equipped with a level sensor that provides information when the ash box becomes full. An empty end is provided for emptying the ash container, which can be opened completely.